Natural Bridges

New DSA required ADA pathway from street to entrance
NB

New Rest Room Building by Gym
NB

Gym interior refresh.
NB


New domestic water supply valves
NB


ROOFING 
roof 1

roof

Next Steps
MP

Existing CampusNatural Bridges Elementary School project plan

Background:

The Natural Bridges site was established in 1964 but is currently vacant and not being utilized for any school or community activities with the exception of the gym.

  • Building Area: 50,345 SF
  • Approximate Site AC: 9.03 Acres
  • Modernization Eligibility: N/A
Natural Bridges Elementary School project plan

Community and Staff Priority Survey

This survey represents input from staff, students, parents, and community as collected during community meetings, school meetings, and online surveys

Top 10 projects in order of importance with 1 being the highest priority.

  1. Re-open campus
  2. Renovate all existing buildings; new interior finishes/lighting/cabinetry
  3. Improve the curb appeal of the campus
  4. Renovate the gym (new finishes, interior and exterior)
  5. Improve the play fields
  6. Campus security
  7. Install new campus-wide HVAC system
  8. Improve student drop-off
  9. Replace plumbing fixtures
  10. Technology upgrades

Note: This list was reviewed and considered by the steering committee in making appropriate project priority recommendations.

Natural Bridges Elementary School project plan

IDENTIFIED CAMPUS NEEDS AND SUGGESTED IMPROVEMENTS

  • Parking improvements
  • Improve student drop-off
  • Technology infrastructure upgrades
  • Remove portable classroom buildings
  • Install new campus-wide HVAC system
  • New interior finishes/lighting/cabinetry Landscaping and irrigation
  • Paving areas
  • Modernize gym
  • Relocate parking
  • Exterior finishes at gym
  • Construct new buildings
  • Community play fields
  • Demo existing gym and build new facility
  • New student quad area
  • Improvements/needs noted are based upon Architect and Engineer assessments of facilities as well as Facilities Staff.
  • Needs in bold have been included on the master plan project list.

Improvements/needs noted are based upon Architect and Engineer assessments of facilities as well as Facilities Staff.

Website by SchoolMessenger Presence. © 2024 SchoolMessenger Corporation. All rights reserved.