Harbor High Site Bond Page
Site Bond Committee
The Pool is OPEN!



Progress on the pool
Over site Committee Presentation May 30th 2019
Ongoing New Pool Construction
Completed Field Project
Time lapse of the Athletic fields.
Video of the New Athletic field project
New resurfaced tennis courts
Track and field coming along.
Summer re-roofing project
Setting of the field lights
Harbor High Committee 6-6-2018
Ongoing work at the Field
Start of work April 2nd 2018
Kick off meeting

Taken Friday March 23rd 2018
Harbor High Athletic Field Ground Breaking

The Athletic Field Project

Existing Campus

Background:
Established in 1967, Harbor High School has a spacious campus with newer facilities compared to other campuses.
- Current Enrollment: 958 Students
- Enrollment Projection: 788 in 2021 / 744 in 2025
- Building Area: 129,102 SF
- Approximate Site AC: 33.98 Acres
- Modernization Eligibility: $1,146,402
Community and Staff Priority Survey
This survey represents input from staff, students, parents, and community as collected during community meetings, school meetings, and online surveys
Top 10 projects in order of importance with 1 being the highest priority.
- Technology Infrastructure Upgrades
- Improve Quad area
- Campus security
- Remove Portable Classroom Buildings
- New performing arts building
- Replace plumbing fixtures
- Replace turf at football/soccer field with synthetic grass
- Renovate/expand pool/pool locker and shower building
- Improve student pick up/ drop off areas
- Landscape and irrigation improvements
Note: This list was reviewed and considered by the steering committee in making appropriate project priority recommendations.
IDENTIFIED CAMPUS NEEDS AND SUGGESTED IMPROVEMENTS
- Improve tennis courts
- Improve campus curb appeal
- Improve student pick up/drop off areas
- Landscape and irrigation improvements
- Campus security improvements (cameras, lighting)
- Improve quad area
- Re-surface paved areas
- Increase parking for athletic fields
- Remove portable classroom buildings and replace with 2-story permanent building
- Replace track surface
- Gym improvements
- Cafeteria and Library renovation
- Replace turf on football/soccer field with synthetic turf
- Harbor High School
- Preserve legacy garden
- Technology and infrastructure upgrades
- Re-design athletic fields (reconfigure)
- Install new campus-wide HVAC system
- Update bleachers
- New interior finishes and lighting campus-wide
- Construct restroom and Snack bar at stadium
- Renovate/expand pool/pool locker and shower building
- New plumbing fixtures
- Upgrade and enlarge kitchen
- New performance arts building
- Needs in bold have been included on the master plan project list.
Improvements/needs noted are based upon Architect and Engineer assessments of facilities as well as Facilities Staff.