Santa Cruz High School Bond Page
New Compact Book Shelving at the Library

Principal Meeting 8/6/2020
2020-08-05--principal-mtg presentation
schs-principal-10-notes-11-agenda
The refurbished gym floor and graphics
Summer domestic water pipe replacement in main building


Gym painting

Roofers reviewing the SCHS gym roof prior to bidding.
New paint, pads and floor work Summer 2018
Existing Campus
Background:
Established in 1922, Santa Cruz High School’s main building provides the campus with its identity.
- Current Enrollment: 1,008 Students
- Enrollment Projection: 1028 in 2021 / 878 in 2025
- Building Area: 160,642 SF
- Approximate Site AC: 15.48 Acres
- Modernization Eligibility: $0
Community and Staff Priority Survey
This survey represents input from staff, students, parents, and community as collected during community meetings, school meetings, and online surveys
Top 10 projects in order of importance with 1 being the highest priority.
- Technology Infrastructure Upgrades
- Renovate science labs
- New interior finishes/ lighting
- Window/door replacement
- Replace plumbing fixtures
- Repair/replace roofs
- New stadium lighting/bleachers/turf/track
- Replace deck at library
- Landscape and irrigation
- Energy efficiency improvements
Note: This list was reviewed and considered by the steering committee in making appropriate project priority recommendations.
IDENTIFIED CAMPUS NEEDS AND SUGGESTED IMPROVEMENTS
- New stadium lighting
- New bleachers, turf and track
- Dugout shade structures
- Renovate tennis courts
- Install parking lot lighting
- Increase parking
- Street frontage improvements
- Secure athletic fields with fencing
- Landscape and irrigation improvements
- Water collection and re-use
- Technology infrastructure upgrades
- Repair and/or replace roofs
- New interior finishes and lighting
- Replace windows and doors
- Waterproof foundation and walls of main building
- Replace deck at library
- Renovate gym building
- Increase restroom quantity
- New snack bar and restroom building at ball fields
- Renovate kitchen and cafeteria
- Energy efficient improvements
- Improve gymnasium restrooms
- Santa Cruz High School
- Provide gathering spaces for students
- Renovate science labs
- Install new campus-wide HVAC system
- Campus security improvements (cameras, lighting)
- New plumbing fixtures
Improvements/needs noted are based upon Architect and Engineer assessments of facilities as well as Facilities Staff.