Soquel High School Bond Page
Modernization of Science lab
20-0519 SQHS Site Bond Committee Presentation
19-1217 SQHS Site Bond Committee Presentation
New refurbished Library now open
New field restrooms
Work on new fire road at back of campus
New Pool Ribbon Cutting
.jpg)
New restroom building being set.
.JPG)
New water piping going in around entire campus.

Site Bond Committee Presentation May 29, 2018
Pool progress

Pool excavation

Pool demolishion

Big crowd for the groundbreaking at Soquel High Pool


Media Release SHS Pool Complex Groundbreaking 5.11.18
Pool being drained. Water was used to irrigate playfield.


Existing Campus
Background:
Constructed in 1962, Soquel High School is the District’s southernmost high school campus.
- Current Enrollment: 1,088 Students
- Enrollment Projection: 1185 in 2021 / 1176 in 2025
- Building Area: 137,142 SF
- Approximate Site AC: 48.79 Acres
- Modernization Eligibility: $0
Community and Staff Priority Survey
This survey represents input from staff, students, parents, and community as collected during community meetings, school meetings, and online surveys
Top 10 projects in order of importance with 1 being the highest priority.
- Technology Infrastructure Upgrades
- Replace/Enlarge and enhance pool complex
- Enhance classroom environment
- Construct new athletic field restrooms
- Remove Portable Classroom Buildings
- Enlarge/Enhance Library
- Provide covered student gathering space
- Window/door replacement
- Replace plumbing fixtures
- Campus beautification
Note: This list was reviewed and considered by the steering committee in making appropriate project priority recommendations.
IDENTIFIED CAMPUS NEEDS AND SUGGESTED IMPROVEMENTS
- Construct new athletic field restrooms
- Replace backstop and dugouts
- Renovate/replace tennis courts
- Renovate Bleachers
- Increase campus security, add cameras/fencing
- Remove natural grass at athletic fields and replace
- New plumbing fixtures
- Windows/door replacement
- Provide student covered gathering places
- Enhance classroom environment and enlarge library
- Re-roof buildings
- Replace accessory buildings at ball fields
- Construct theater building
- Enlarge Cafeteria
- Replace/enlarge and enhance pool complex
- Parking improvements
- Replace asphalt sidewalks with concrete
- Relocate district offices off campus
- Campus beautification
- Remove portable classroom buildings and replace
- Install new campus-wide HVAC system
- Landscape and irrigation improvements with synthetic turf
Improvements/needs noted are based upon Architect and Engineer assessments of facilities as well as Facilities Staff.